Front
Cottage construction
Building a cottage is a complex multi-stage process requiring careful planning and professional approach. A modern cottage represents comfortable housing of 100-300 m² located on a separate land plot.
Main construction stages:
-
Design
Project development includes:
-
Architectural solutions
-
Structural features
-
Engineering communications
Duration: 1-3 months
Cost: from $20/m²
-
Site preparation
-
Geodetic surveys
-
Territory clearing
-
Temporary utilities installation
-
Foundation construction
Popular types:
-
Strip (depth 1.5-2 m)
-
Slab (for difficult soils)
-
Pile-grillage
Timing: 2-4 weeks
Cost: 15-25% of budget
-
Building the frame
Material options:
-
Brick (100+ years durability)
-
Aerated concrete (optimal price/quality ratio)
-
Wood (eco-friendliness)
-
Monolithic concrete (maximum strength)
-
Roof installation
Main types:
-
Gable (classic)
-
Hip (stable)
-
Flat (modern style)
Materials: metal tiles, flexible shingles, natural tiles
-
Engineering systems
-
Power supply (10-15 kW)
-
Water supply (well or central system)
-
Sewage (septic tank or biological treatment)
-
Heating (gas, electric, solid fuel)
-
Finishing works
Interior finishing:
-
Rough (plaster, screed)
-
Fine (tiles, wallpaper, painting)
Exterior finishing: -
Plaster
-
Facing brick
-
Siding
Construction timeline:
-
Frame technology: 4-6 months
-
Stone houses: 8-14 months
-
Log houses: 6-12 months (considering shrinkage)
Construction budget:
-
Economy class: from $500/m²
-
Business class: from $850/m²
-
Premium class: from $1,400/m²
Construction tips:
-
Choose verified contractors with portfolio
-
Make detailed contract
-
Control construction stages
-
Allocate 15-20% budget for unforeseen expenses
-
Include landscape design in general project
Modern trends:
-
Smart control systems
-
Energy efficient solutions
-
Eco-friendly materials
-
Multifunctional spaces